Four stages, one point of contact.

Most of what separates a good interior renovation from an expensive one happens before anybody sees a finish. This is the order we do it in.

Herringbone oak flooring part-laid across a room during installation
01

Walkthrough

We come to the site, measure, and talk through what you want the finished room to do. You get a scope written in plain terms and a price against it, not a range.

A stair opening cut and braced through a finished herringbone floor

Measured on site, before anything is priced

Close view of a white oak herringbone floor
02

Drawings & selections

Millwork gets shop drawings. Slab gets selected at the yard, with the vein laid out against the cuts. Tile, metal, and finishes are agreed before anything is ordered.

A marble slab surface showing the vein selected at the yard

Slab chosen at the yard, millwork drawn before it is cut

A concealed hinge in the edge of a white oak cabinet door
03

Build

One crew, one schedule, one person you call. Rough-in is set out to the finished dimensions so the details we drew are still possible at the end.

Herringbone oak flooring part-laid across a room during installation

One crew, one schedule, rough-in set to finished dimensions

Slab shower walls part-installed with the room masked off
04

Finish & handover

Plaster, paint, and hardware go on last. We walk the job with you, list what is left, and close the list before we leave.

A finished plastered arch outlined by a continuous cove light

Plaster, paint and hardware last, then the list is closed

A brass tap set into a marble vanity top
A finished room seen straight on: a plastered barrel arch over a cove-lit oak wainscot

The questionsthat come up every time.

What does a price actually cover?
A written scope, line by line, against a fixed number. Where something genuinely cannot be priced until a wall is open, we name it as an allowance up front rather than burying it.
Who is on site?
Our own crew for millwork, stone, tile and floors. Licensed trades for electrical, plumbing and HVAC, on our schedule. One person is your contact throughout.
How do selections work?
Slab is chosen at the yard with the cuts laid out against the vein. Millwork gets shop drawings you sign off. Tile, metal and paint are agreed before anything is ordered.
What happens at the end?
We walk the job with you and write the list together. It gets closed before we leave, not after.